Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the learnpress domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/307845.cloudwaysapps.com/guvzwmesxc/public_html/wp-includes/functions.php on line 6170

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the learnpress domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/307845.cloudwaysapps.com/guvzwmesxc/public_html/wp-includes/functions.php on line 6170

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the paid-memberships-pro domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/307845.cloudwaysapps.com/guvzwmesxc/public_html/wp-includes/functions.php on line 6170

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the thim-elementor-kit domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/307845.cloudwaysapps.com/guvzwmesxc/public_html/wp-includes/functions.php on line 6170

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the podcast-player domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/307845.cloudwaysapps.com/guvzwmesxc/public_html/wp-includes/functions.php on line 6170
2025-08-21 – https://www.esgtoday.com/google-signs-deal-to-power-data-centers-from-advanced-nuclear-plant-by-2030/?utm_source=rss&utm_medium=rss&utm_campaign=google-signs-deal-to-power-data-centers-from-advanced-nuclear-plant-by-2030 - ESGNA
Warning: preg_match(): Compilation failed: missing terminating ] for character class at offset 29 in /home/307845.cloudwaysapps.com/guvzwmesxc/public_html/wp-content/plugins/super-ai-seo/includes/output.php on line 130

Raw: [

Google, nuclear technology company Kairos Power, and the Tennessee Valley Authority (TVA) announced a new […]]

Google Signs Deal to Power Data Centers from Advanced Nuclear Plant by 2030 – ESG Today

ESG Investing, sustainable finance & business sustainability news

ESG investing news, analysis, research and information

Top Stories ESG News
Companies
Government
Investors
Regulators
Sustainable Finance

ESG Solutions ESG Tools, Services

Companies Companies

Investors Investors

ESG Disclosure ESG Reporting
Analysis
Regulators
Reports, Studies

Newsfeed
Resources
Events
About About us
Our Team
Advertise With Us

Companies/ Energy Transition

Google Signs Deal to Power Data Centers from Advanced Nuclear Plant by 2030

Emanuela Hawker

August 20, 2025

Google, nuclear technology company Kairos Power, and the Tennessee Valley Authority (TVA) announced a new collaboration to deliver advanced nuclear energy to Google data centers in the US.
Under the deal, TVA will purchase power from Kairos Power’s Hermes 2 plant in Tennessee, which will deliver up to 50 megawatts (MW) of 24-hour energy to the TVA grid. Google will then receive the clean energy attributes through TVA to support operations at its Tennessee, and Alabama data centers.
The Hermes 2 plant is scheduled to begin operations in 2030. To speed up the delivery of clean energy, Kairos Power will boost the plant’s output from 28 MW to 50 MW generated by a single reactor.
This facility is the first deployment under Kairos Power’s broader agreement with Google to bring 500 MW of advanced nuclear capacity online by 2035 in support of Google’s growing load demand.
Google first partnered with Kairos Power in October 2024 to advance multiple small modular reactor deployments, with plans to enable 500 MW of new, advanced nuclear capacity to come online by 2035.
Mike Laufer, Kairos Power CEO and Co-Founder, said:
“This collaboration is an important enabler to making advanced nuclear energy commercially competitive. The re-envisioned Hermes 2 gets us closer to the commercial fleet sooner and could only be made possible by close collaboration with TVA and Google, and a supportive local community. We are excited to grow Kairos Power’s operations in Oak Ridge while writing a new chapter in the region’s distinguished nuclear history.”
The companies emphasized that, by coupling utility-scale innovation with corporate demand, the collaboration seeks to strengthen local economic growth while advancing America’s leadership in nuclear energy.
Don Moul, CEO of TVA, said:
“Nuclear is the bedrock of the future of energy security. Google stepping in and helping shoulder the burden of the cost and risk for first-of-a-kind nuclear projects not only helps Google get to those solutions, but it keeps us from having to burden our customers with development of that technology. So it’s not just good for Google, it’s good for TVA’s 10 million customers. It’s good for the United States.”
The new agreement follows Google’s announcement in July that it managed to reduce the carbon emissions from its data centers by 12% in 2024, despite significantly higher energy usage.
Despite Google’s success in addressing its data center emissions, it said that the company’s overall carbon footprint continued to grow in 2024, driven by a sharp increase in emissions from its supply chain, with Scope 3 emissions rising by more than 20% in the year.
Google’s data center emissions achievement nonetheless marks a sharp turnaround for the company, following a 37% increase in Scope 2 emissions – which include purchased electricity for data centers and offices – reported in the prior year, and comes despite a 27% increase in electricity demand from its data centers.
Google also highlighted its efforts to improve data center energy efficiency as a key source of emissions reduction, with the company noting that its data centers now deliver more than six times more computing power per unit of electricity than they did five years ago.

Emanuela Hawker

Related Posts

Companies /

BlackRock Acquires Stake in Eni’s Carbon Capture Platform

Energy Transition /

Guest Post: Telling Oil and Gas Giants to Ditch Fossil Fuels is the Wrong Approach to Decarbonization

Companies /

Sandoz Sources Renewable Energy for 90% of Europe Operations

‹ BlackRock Acquires Stake in Eni’s Carbon Capture Platform

ESG Today Newsletter – Subscribe

Subscribe to the ESG Today NewsletterJoin our mailing list for the latest breaking ESG investment news!

LevelC-LevelSVP / EVPDirector / VPManager / SupervisorMid or Entry LevelFreelance / ContractStudent / InternRetiredOther

FunctionAccounting & FinanceBusiness Development & SalesCustomer SupportFacilitiesHR & TalentInvestingLegalMarketing & CommunicationsOperationsR & DProcurement & ContractingSupply Chain & DistributionSustainabilityStrategyTechnologyOther

SUBSCRIBE!

You have Successfully Subscribed!

Sustainable Finance

FCA Says Sustainability-Linked Loan Market Has Become More Mature, Credible

23 State Coalition Warns SBTi, Financial Firms Over Antitrust Risk from Net Zero Commitments

Fortescue Turns to China for $2 Billion Loan to Fund Decarbonization as U.S. “Steps Back” from Green Investments

Standard Chartered Signs Deal to Sell Carbon Credits to Protect Rainforests

Government

California Climate Reporting Law Survives Court Challenge

23 State Coalition Warns SBTi, Financial Firms Over Antitrust Risk from Net Zero Commitments

U.S. to Invest $500 Million in Battery Materials, Manufacturing and Recycling

U.S. FTC Drops Antitrust Investigation Against Volvo, Daimler After Truckmakers Commit to Not Enforce California Emissions Reduction Agreement

Categories
Select Category
Companies
Energy Transition
Environment
ESG Reporting
ESG Tools, Services
Executive Moves
Governance
Government
Guest Posts
Investors
M&A
New funds & products
Platforms & Markets
Private Equity & Venture Capital
Professional bodies
Regulators
Reports, Studies
Social
Social & Governance
Sustainable Finance

Back to Top

Home
About us
Disclosure, cookies & privacy policy

© ESG Today 2025

Don’t miss the top ESG stories!Join the ESG Today daily newsletter and get all the top ESG stories, like this one.
Subscribe now below!

LevelC-LevelSVP / EVPDirector / VPManager / SupervisorMid or Entry LevelFreelance / ContractStudent / InternRetiredOther

FunctionAccounting & FinanceBusiness Development & SalesCustomer SupportFacilitiesHR & TalentInvestingLegalMarketing & CommunicationsOperationsProcurement & ContractingR & DStrategySupply Chain & DistributionSustainabilityTechnologyOther

SUBSCRIBE!

You have Successfully Subscribed!